Difference between revisions of "Category:Community Projects"

From Twin Cities Maker wiki
Jump to: navigation, search
 
(10 intermediate revisions by the same user not shown)
Line 8: Line 8:
 
! scope="col"| Manager / Contact
 
! scope="col"| Manager / Contact
 
|-
 
|-
| <big>Landscaping Outside</big>
+
| <big>Outside Maintenance</big>
 +
* Weeds in Beds Trimmed
 +
* Move Bicycle Rack Regularly for Mowing
 
| ALL
 
| ALL
 
| George
 
| George
 
|-
 
|-
| <big>Keep Inside Trash Cans Emptied</big>
+
| <big>Inside Maintenance</big>
 +
* Keep Inside Trash Cans Emptied
 +
* Clean Sinks (kitchen, 2x Bathrooms)
 +
* Classroom Swept
 
| ALL
 
| ALL
 
| ALL
 
| ALL
Line 18: Line 23:
  
  
 +
 +
== Quarterly Cleanup ==
 +
*Up For Grabs Shelf Emptied of Old Stuff
 +
*Member Storage Safety Cleanup
 +
*Front Lobby / Computer Lab / Electronics / Ham Radio Cleanup
 +
*Metal Shop Safety Cleaning
 +
*Wood Shop Safety Cleaning
 +
*Machine Shop Safety Cleaning
 +
*Laser Shop Safety Cleanup
 +
*Finishing Room Clean Up
 +
*Basement Safety Cleaning
  
 
== Large Projects ==
 
== Large Projects ==
Line 40: Line 56:
 
| ALL
 
| ALL
 
| Sam
 
| Sam
 +
|-
 +
|Build new nesting tables
 +
| ALL
 +
| &nbsp;??
 +
|-
 +
|Install temporary drywall in classroom
 +
cut and mount, no taping/spackle
 +
| ALL
 +
| &nbsp;??
 +
|-
 +
|Alleyway + Main Parking Lot Janky/Abandoned Wood Disposal
 +
| ALL
 +
| &nbsp;??
 +
|-
 +
|Clean off” the Laser Room roof
 +
Lots of weird stuff up there for a long time… some of it being Phil’s
 +
| ALL
 +
| &nbsp;??
 +
|-
 +
|Scary Bathroom Cleaned Out
 +
| ALL
 +
| &nbsp;??
 +
|-
 +
|Lights on Front Walkway
 +
| ALL
 +
| &nbsp;??
 +
|-
 +
|Light on Main (dumpster) Parking Lot
 +
| ALL
 +
| &nbsp;??
 +
|-
 +
|Classroom Light Ballasts / Bulbs
 +
| ALL
 +
| &nbsp;??
 +
|-
 +
|Electrical Room Cleanup with Shelves, Bins, Hooks, etc.
 +
| ALL
 +
| &nbsp;??
 +
|-
 +
|Electrical Room Circuit Inventory (with clear Labels)
 +
| ALL
 +
| &nbsp;??
 +
|-
 +
|Lobby A/C Condensation Line Rework
 +
* It leaks into basement
 +
| &nbsp;
 +
| &nbsp;??
 +
|-
 +
|Double Lock (with ID on locks) for TCM and Jepson
 +
| ALL
 +
| &nbsp;??
 
|-
 
|-
 
| <big>[[Water System Update]]</big> (may be multiple)
 
| <big>[[Water System Update]]</big> (may be multiple)
* Pressure in Classroom, Cleaning Spigot/Drain,&nbsp (in Process)  
+
* Pressure in Classroom, Cleaning Spigot/Drain (in Process)  
 
* Back pressure from Hot into Jepsen Steel
 
* Back pressure from Hot into Jepsen Steel
 
* Slop Sink near Metal Shop
 
* Slop Sink near Metal Shop
Line 49: Line 116:
 
| &nbsp;??
 
| &nbsp;??
 
|-
 
|-
| <big>[[Basement Update 2017]]</big>(in Process)
+
| <big>[[Basement Update 2017]]</big> (in Process)
 
| Artifactory
 
| Artifactory
 
| Kyle
 
| Kyle
Line 55: Line 122:
 
| <big>[[Front Lobby Refurbish]]</big> (in Process)
 
| <big>[[Front Lobby Refurbish]]</big> (in Process)
 
* floors, bathroom, furniture, etc. is included
 
* floors, bathroom, furniture, etc. is included
 +
* Finish Lighting upgrade to LED with same lights + covers
 
| ALL
 
| ALL
 
| Chris, Scott, and Becca
 
| Chris, Scott, and Becca
 
|-
 
|-
 
| <big>[[Small Parts Storage]]</big> (in Progress)
 
| <big>[[Small Parts Storage]]</big> (in Progress)
*Totes/Shelves
+
* Totes/Shelves
 
| Wood Shop
 
| Wood Shop
 
| &nbsp;Jon / Zac
 
| &nbsp;Jon / Zac
Line 82: Line 150:
 
| Security and Access System (may be multiple)
 
| Security and Access System (may be multiple)
 
* Door Access (need code + enhance resilience)
 
* Door Access (need code + enhance resilience)
* Outside Lights / Security Cameras
+
* Outside Lights
 +
* Security Cameras
 +
** Relocate Wood Shop Center from over Vacuum
 +
** Corner in main parking lot (have camera)
 +
** Corner in side parking lot
 +
** 3rd camera for Wood Shop (have camera)
 +
** Adjust Machine Shop Camera (after final layout)
 
* Major Tool Activation/Tracking on Member RFID Cards
 
* Major Tool Activation/Tracking on Member RFID Cards
 
| ALL
 
| ALL
Line 91: Line 165:
 
| &nbsp;??
 
| &nbsp;??
 
|-
 
|-
| Refresh Space Allocation with designated "aisles"
+
| Lobby Bathroom water shutoff valve
 +
(so we don't have to shutoff building water to fix toilet)
 
| ALL
 
| ALL
 
| &nbsp;??
 
| &nbsp;??

Latest revision as of 16:53, 15 November 2017

As we move Twin Cities Maker forward as a community, project are organized by the Board, Shop Managers, or individual Members. Here is a list of Community Projects and their status:

Continuing Work

Project Department Manager / Contact
Outside Maintenance
  • Weeds in Beds Trimmed
  • Move Bicycle Rack Regularly for Mowing
ALL George
Inside Maintenance
  • Keep Inside Trash Cans Emptied
  • Clean Sinks (kitchen, 2x Bathrooms)
  • Classroom Swept
ALL ALL


Quarterly Cleanup

  • Up For Grabs Shelf Emptied of Old Stuff
  • Member Storage Safety Cleanup
  • Front Lobby / Computer Lab / Electronics / Ham Radio Cleanup
  • Metal Shop Safety Cleaning
  • Wood Shop Safety Cleaning
  • Machine Shop Safety Cleaning
  • Laser Shop Safety Cleanup
  • Finishing Room Clean Up
  • Basement Safety Cleaning

Large Projects

Project Department Manager / Contact
Computer Lab Update 2017 (in Process) ALL Scott and Becca
Tool Inventory and Documentation (in Process) Metal, Machine, ArtiFactory  ??
Member Storage Update (may be multiple)
  • "Cubby" Shelves (in Process)
  • Uniform Pallet Racks
ALL Sam
Build new nesting tables ALL  ??
Install temporary drywall in classroom

cut and mount, no taping/spackle

ALL  ??
Alleyway + Main Parking Lot Janky/Abandoned Wood Disposal ALL  ??
Clean off” the Laser Room roof

Lots of weird stuff up there for a long time… some of it being Phil’s

ALL  ??
Scary Bathroom Cleaned Out ALL  ??
Lights on Front Walkway ALL  ??
Light on Main (dumpster) Parking Lot ALL  ??
Classroom Light Ballasts / Bulbs ALL  ??
Electrical Room Cleanup with Shelves, Bins, Hooks, etc. ALL  ??
Electrical Room Circuit Inventory (with clear Labels) ALL  ??
Lobby A/C Condensation Line Rework
  • It leaks into basement
   ??
Double Lock (with ID on locks) for TCM and Jepson ALL  ??
Water System Update (may be multiple)
  • Pressure in Classroom, Cleaning Spigot/Drain (in Process)
  • Back pressure from Hot into Jepsen Steel
  • Slop Sink near Metal Shop
  • Bucket Station for Mop Buckets
ALL  ??
Basement Update 2017 (in Process) Artifactory Kyle
Front Lobby Refurbish (in Process)
  • floors, bathroom, furniture, etc. is included
  • Finish Lighting upgrade to LED with same lights + covers
ALL Chris, Scott, and Becca
Small Parts Storage (in Progress)
  • Totes/Shelves
Wood Shop  Jon / Zac
Classroom Refurbish (in Planning) ALL  ??
Machine Shop Reorganization 2017 (in Planning) Machine Shop George
Laser Room Repairs
  • e.g.(Walls, Admin PC in wall, AC upgrade, etc.) / Relocate to better space?
ALL Scott?
TCMaker Web Site(s) Update (plus finnish migration of old Wiki) ALL  ??
Security and Access System (may be multiple)
  • Door Access (need code + enhance resilience)
  • Outside Lights
  • Security Cameras
    • Relocate Wood Shop Center from over Vacuum
    • Corner in main parking lot (have camera)
    • Corner in side parking lot
    • 3rd camera for Wood Shop (have camera)
    • Adjust Machine Shop Camera (after final layout)
  • Major Tool Activation/Tracking on Member RFID Cards
ALL  ??
Scary Bathroom conversion to ? (CNC Room, Lathe Room) ALL  ??
Lobby Bathroom water shutoff valve

(so we don't have to shutoff building water to fix toilet)

ALL  ??
Basement Bathroom Rehab ALL  ??
Facility Air Handling ALL  ??
Outside Patio ALL  ??
Plasma Table ALL  ??
Roof Leak Remediation ALL  ??
Vending Machine Relocation ALL  ??

Woodshop Projects

Link to Dropbox List

Completed

  1. Finishing Room (Complete)
  2. Member Storage Reorganization (Complete)
  3. 4x4 CNC Rehabilitation (Complete)
  4. Woodshop Central Vacuum System (Completed) 9-30-17

Pages in category "Community Projects"

The following 6 pages are in this category, out of 6 total.