Line 31: Line 31:
 
| Scott
 
| Scott
 
|-
 
|-
| Tool Inventory and Documentation (in Process)
+
| [[Tool Inventory and Documentation]] (in Process)
 
| Metal, Machine, ArtiFactory
 
| Metal, Machine, ArtiFactory
 
|  ??
 
|  ??
 
|-
 
|-
| Member Storage (may be multiple)
+
| [[Member Storage Update]] (may be multiple)
 
* "Cubby" Shelves (in Process)
 
* "Cubby" Shelves (in Process)
 
* Uniform Pallet Racks
 
* Uniform Pallet Racks
Line 41: Line 41:
 
| Sam
 
| Sam
 
|-
 
|-
| Water System (in Process)  
+
| [[Water System Update]] (may be multiple)
* Pressure in Classroom, Cleaning Spigot/Drain, ??
+
* Pressure in Classroom, Cleaning Spigot/Drain,&nbsp (in Process) ;??  
 +
* Slop Sink near Metal Shop
 +
* Bucket Station for Mop Buckets
 
| ALL
 
| ALL
 
|  ??
 
|  ??
Line 49: Line 51:
 
| Artifactory
 
| Artifactory
 
| Kyle
 
| Kyle
 +
|-
 +
| [[Front Lobby Refurbish]] (in Process)
 +
* floors, bathroom, furniture, etc. is included
 +
| ALL
 +
|  ??
 
|-
 
|-
 
| [[Classroom_Refurbish|Classroom Refurbish]] (in Planning)
 
| [[Classroom_Refurbish|Classroom Refurbish]] (in Planning)
Line 103: Line 110:
 
|-
 
|-
 
| Roof Leak Remediation
 
| Roof Leak Remediation
| ALL
 
|  ??
 
|-
 
| Front Lobby (floors, bathroom, furniture, etc. is included)
 
 
| ALL
 
| ALL
 
|  ??
 
|  ??

Revision as of 12:36, 16 October 2017

As we move Twin Cities Maker forward as a community, project are organized by the Board, Shop Managers, or individual Members. Here is a list of Community Projects and their status:

Continuing Work

Project Department Manager / Contact
Landscaping Outside ALL George
Keep Inside Trash Cans Emptied ALL ALL


Large Projects

Project Department Manager / Contact
Computer Lab Update 2017 (in Process) ALL Scott
Tool Inventory and Documentation (in Process) Metal, Machine, ArtiFactory  ??
Member Storage Update (may be multiple)
  • "Cubby" Shelves (in Process)
  • Uniform Pallet Racks
ALL Sam
Water System Update (may be multiple)
  • Pressure in Classroom, Cleaning Spigot/Drain,&nbsp (in Process) ;??
  • Slop Sink near Metal Shop
  • Bucket Station for Mop Buckets
ALL  ??
Basement Update 2017 (in Process) Artifactory Kyle
Front Lobby Refurbish (in Process)
  • floors, bathroom, furniture, etc. is included
ALL  ??
Classroom Refurbish (in Planning) ALL  ??
Small Parts Storage Totes/Shelves Wood Shop  Jon / Zac
Machine Shop Reorganization Machine Shop  ??
Laser Room Repairs
  • e.g.(Walls, Admin PC in wall, AC upgrade, etc.) / Relocate to better space?
ALL Scott?
TCMaker Web Site(s) Update (plus finnish migration of old Wiki) ALL  ??
Security and Access System (may be multiple)
  • Door Access (need code + enhance resilience)
  • Outside Lights / Security Cameras
  • Major Tool Activation/Tracking on Member RFID Cards
ALL  ??
Scary Bathroom conversion to ? (CNC Room, Lathe Room) ALL  ??
Refresh Space Allocation with designated "aisles" ALL  ??
Basement Bathroom Rehab ALL  ??
Facility Air Handling ALL  ??
Outside Patio ALL  ??
Plasma Table ALL  ??
Roof Leak Remediation ALL  ??
Vending Machine Relocation ALL  ??

Woodshop Projects

Link to Dropbox List

Completed

  1. Finishing Room (Complete)
  2. Member Storage Reorganization (Complete)
  3. 4x4 CNC Rehabilitation (Complete)
  4. Woodshop Central Vacuum System (Completed) 9-30-17